GOAL OF THE STUDY :
The objective of this study is to develop the study of works of construction of a cob sand stop and reinforcement of port protection works of Sidi Ifni.
CONTENT AND CONDUCT OF BENEFITS :
This service is for conducting an arrest sand spike and reinforcement of protection works of the port of Sidi IFNI.
OWNER :
Agence Nationale des Ports (ANP)
DATE :
2011