GOAL OF THE STUDY :
The purpose of this provision is to achieve the execution of construction work studies a furnished landing point OUED LAOU.
CONTENT AND CONDUCT OF BENEFITS :
Benefits include the study of execution of the landing point of the protection structures laid out OUED LAOU.
OWNER :
MANAGEMENT PORTS AND MARITIME PUBLIC AREAS.
DEADLINE :
This study was conducted during the period de2011.