GOAL OF THE STUDY :
The objective of this study is the technical assistance and monitoring the work of the extension of the port of the new tourist resort Mediteranea SAIDIA.
CONTENT AND CONDUCT OF THE STUDY :
Benefits include the following tasks:
Performing a main pier 1070 ml in length.
The realization of a cross member 180 ml of length.
Performing a backed platform the main pier having a length of 670 ml.
The realization of an embankment protection rider into the new pool of approximately 300 ml in length.
Dredging of the basin with backfill setting for the creation of a land full of about 5ha in area adjacent to the cavalier project.
OWNER :
FADESA MOROCCO GROUP (GFM)
TIME LIMIT :
The provision of technical assistance and monitoring work is carried out during the period from June 2008 to August 2009.
YEAR :
2009