GOAL OF THE STUDY :
The objective of this study is to achieve the protection and reinforcement of sea embankment beside the studies section of the RN 13 located BAB SEBTA.
CONTENT AND RUNNING BENEFIT :
The study was divided into 3 missions defined as follows:
MISSION 1: preliminary design kit.
MISSION 2: Dossier of detailed design.
MISSION 3: Bidding Documents.
OWNER :
MANAGEMENT PORTS AND MARITIME PUBLIC AREAS.
DEADLINE :
The total period of the study is 3 months.
YEAR :
2009
NOTES: