STUDY DIAGNOSIS JETEE HOME PORT ESSAOUIRA

 

 

GOAL OF THE STUDY :

The objective of this study is to perform diagnostic execution studies of the main pier of the port of Essaouira.

CONTENT AND CONDUCT OF BENEFITS :

MDC engineering was responsible for carrying out the following studies:

  • Making a topo-bathymetric survey of the entire study area.

  • reinforcement of quality analysis of the pier and its compliance with the rules of art.

  • Diagnosis and visual inspection of the main pier of the port of Essaouira.

OWNER :

MINISTER OF EQUIPMENT AND TRASPORT

DEADLINE  :

1 month

YEAR  :

2010

NOTES :