OBJECTIVE OF BENEFITS :
Conducting studies APD and DCE of a new fishing port Lamhiriz.
CONTENT AND CONDUCT OF THE STUDY :
Benefits include the following tasks:
Mission 1: Study of detailed design (ODA).
bathymetry
Calculating swells by mathematical model
Environmental impact study
Study before detailed port project
Mission 2: Business Consultation documents (DCE)
OWNER :
National Ports Agency (ANP).
DEADLINE :
The total period of the study is five months
DATE :
2011
NOTES :