PROJECT BEFORE DETAILED STUDY OF NEW PORT OF FISHING LAMHIRIZ

 

 

OBJECTIVE OF BENEFITS :

Conducting studies APD and DCE of a new fishing port Lamhiriz.

CONTENT AND CONDUCT OF THE STUDY :

Benefits include the following tasks:

  • Mission 1: Study of detailed design (ODA).

    • bathymetry

    • Calculating swells by mathematical model

    • Environmental impact study

    • Study before detailed port project

  • Mission 2: Business Consultation documents (DCE)

OWNER :

National Ports Agency (ANP).

DEADLINE  :

The total period of the study is five months

DATE :

2011

NOTES :