PERFORMANCE REVIEW OF IMPLEMENTATION OF THE WORK OF A NEW PORT KSAR SGHIR – LOT NUMBER 1

 

 

GOAL OF THE STUDY :

The objective of this service is the realization of execution of construction studies of a new port at Ksar SGHIR – Lot 1: protection works and embankments.

CONTENT AND CONDUCT OF BENEFITS :

Benefits include running study following protection works:

  • main pier length L = 1208 mL.

  • secondary breakwater L = 265 ml.

  • Horsemen and medians.

OWNER :

HARBORS AND MARITIME PUBLIC DOMAIN

DEADLINE  :

This study was conducted during the 2008/2009 period

NOTES: