GOAL OF THE STUDY :
The objective of this study is to perform follow-up studies and technical assistance for the work of construction of a new port in Ksar SGHIR – Lot 2.1 docking works.
CONTENT AND RUNNING BENEFIT :
The study will be conducted in three missions:
MISSION 1: Site Monitoring.
MISSION 2: Technical Assistance.
MISSION 3: Review, Audit and Visa executing study.
MISSION 4: Harbor resident civil engineer.
The main works within the port carrying frame are defined as follows:
450ml around docks at -7.00 Hydro.
A RO-RO bridge fixed width of approximately 29 ml.
About 80 ml of docks -6.00 Hydro.
226 ml approximately docks at -4.00 Hydro.
About 70 ml of docks -3.00 Hydro.
235 ml approximately rider protection embankments.
264 ml of floating piers.
9.4Ha about medians.
OWNER :
HARBORS AND MARITIME PUBLIC DOMAIN
DEADLINE :
The total period of the study is 16 months.
YEAR :
2009-2010
NOTES: