MONITORING STUDY AND TECHNICAL ASSISTANCE FOR THE WORK OF REALIZATION OF A NEW PORT KSAR SGHIR – LOT NUMBER 2

 

 

GOAL OF THE STUDY :

The objective of this study is to perform follow-up studies and technical assistance for the work of construction of a new port in Ksar SGHIR – Lot 2.1 docking works.

CONTENT AND RUNNING BENEFIT :

The study will be conducted in three missions:

  • MISSION 1: Site Monitoring.

  • MISSION 2: Technical Assistance.

  • MISSION 3: Review, Audit and Visa executing study.

  • MISSION 4: Harbor resident civil engineer.

The main works within the port carrying frame are defined as follows:

  • 450ml around docks at -7.00 Hydro.

  • A RO-RO bridge fixed width of approximately 29 ml.

  • About 80 ml of docks -6.00 Hydro.

  • 226 ml approximately docks at -4.00 Hydro.

  • About 70 ml of docks -3.00 Hydro.

  • 235 ml approximately rider protection embankments.

  • 264 ml of floating piers.

  • 9.4Ha about medians.

OWNER :

HARBORS AND MARITIME PUBLIC DOMAIN

DEADLINE  :

The total period of the study is 16 months.

YEAR  :

2009-2010

NOTES: